The steel trusses are going up on Buildings O and P.
With the block walls topped out, the crews moved to the roof structure — setting the steel trusses that span the full width of each building and carry the roof clear across the units below, no interior columns in the way.
That's what gives a Vehicle Fortress unit its wide-open floor plan, and it's the last major structural step before these two buildings get dried in.
13 of the 24 units across Buildings O and P are already spoken for. See what's left on our listings page, with live availability.
Call Phil at (239) 591-4700 for what's left.